Technical brief and site survey
Before any site visit, we align on the precise project objectives: building type, area to be surveyed, expected deliverable (Revit, IFC 4.0, 2D drawings), level of detail (LOD 200 to 400), access constraints and construction schedule.
A preliminary visit is organized for complex missions: scanner anchor-point survey, identification of risk zones (fragile roofs, ceiling height > 8 m, cluttered interiors), validation of drone permits if needed (DGAC controlled zones, urban airspace, private overflight).
A detailed quote is sent within 48 business hours, including acquisition + processing + modeling + one revision iteration. No surprises mid-mission: everything is locked before kickoff.
Equipment
- Site survey
- Preliminary measurements
- Simulated RTK calculations
Deliverables
- Technical scoping note
- Detailed quote within 48h
- Intervention schedule
- DGAC permit applications