Old Town and civilian port
Clock tower, opera house, market halls, Port de la Daurade. ABF surveys for refurbishment, renovation.
PACA studio, working in Toulon, the harbor area, and the Toulon-Provence-Méditerranée metropolitan area.

Toulon combines: a military port (France's largest naval base, restricted-access zone), a civilian port heritage (marina, ferries to Sicily / Sardinia), a dense old town (lower town, Mourillon, La Beaucaire districts) and a metropolitan area stretching along the harbor.
ARPEO works in Toulon with the laser scanner and the RTK drone, outside the restricted military zone. AlphaTango + French Navy coordination for proximity to naval facilities. Delivery format compatible with the TPM metropolitan GIS.
ABF compliance for the Old Town and the protected sector. 15-day delivery.
From heritage renovation to port-structure drone inspection.
Three typologies recurring across the TPM metropolitan area.
Clock tower, opera house, market halls, Port de la Daurade. ABF surveys for refurbishment, renovation.
Mourillon, old port, ferry terminals. Combined drone + scanner survey for structure monitoring.
Pont-du-Las, La Rode, Saint-Jean-du-Var. Energy audit, BIM operations.
Toulon intra-muros and the entire Toulon-Provence-Méditerranée metropolitan area.
Towns served: La Seyne-sur-Mer, La Garde, La Valette-du-Var, Six-Fours, Sanary, Hyères, La Crau, Carqueiranne.
Familiar with missions near the restricted military zone. Navy coordination for drone authorizations.
Survey methodology adapted to quays, jetties, breakwaters: combined drone + scanner + GNSS.
ABF-compatible deliverables for the protected sector.
Contractual acquisition-to-delivery.
Outside the restricted military zone (naval base, arsenal), yes — with an AlphaTango declaration. For missions near the French Navy zone, Navy + DGAC authorization is required. ARPEO puts together the files, 15 to 30 days lead time.
Only with express approval from the French Navy. Operations in the restricted military zone require Confidentiel Défense clearance + command approval. Not routine — case-by-case consultation.
Priced quote within 48 h, mobilization within 5 working days. Revit, IFC or DWG delivery in 15 days.