Haussmann co-ownerships
Préfecture, Castellane, Endoume. LOD 300 model for thermal renovation, financing plan, works monitoring.
LOD 200 to 400 digital model from the point cloud. Revit, ArchiCAD, IFC 4.0 compatible. For heavy renovation, operations management and label applications.

Scan-to-BIM transforms a 3D point cloud into an exploitable digital model. In Marseille, ARPEO delivers Revit, ArchiCAD or IFC 4.0 models from laser and photogrammetric scans. LOD 200 to 400 depending on end use (feasibility, operations, heavy renovation).
Our method: field scan (BLK360 G2), Cyclone registration, Revit modeling with IFC quality control. BIM Manager validation built into the process. Compatible with Aix-Marseille-Provence metropolitan standards.
15-day lead time from acquisition to LOD 200 delivery. 25 days for LOD 300. 35 days for LOD 400. Quote within 48 h.
Five steps, from field scan to validated model.
Leica BLK360 G2 on site. 1 to 5 days depending on surface. HDS targets for registration accuracy.
Colorized cloud georeferenced Lambert-93. Client validation before modeling.
Modeling per LOD defined at quote. LOD 200 = simplified envelopes. LOD 300 = detailed components. LOD 400 = identified manufacturers.
Quality control: IFC audit (Solibri), cloud-vs-model deviation check (±10 mm max). Report delivered to BIM Manager.
RVT + IFC 4.0 + audit report + archived E57 cloud. Compatible with the client's BIM Manager workflow.
Five dominant uses in the city.
Préfecture, Castellane, Endoume. LOD 300 model for thermal renovation, financing plan, works monitoring.
Belle de Mai, J1, La Joliette. LOD 200 model for feasibility studies, selective demolition.
Vieil Marseille, Saint-Victor Abbey. LOD 400 model for long-term archiving + DRAC management plan.
BIM-CIM for maintenance, BIM operations. IFC industrial extensions compatible.
Social housing, co-ownerships, corporate real estate. LOD 200 model for digital DOE and facility management.
Per-m² pricing depending on LOD. Acquisition scan included or billed separately per quote.
LOD 200 = feasibility studies, energy audit, asset management. LOD 300 = heavy renovation, financing plan, works monitoring. LOD 400 = manufacturing, industrial BIM-CIM, long-term archiving. LOD 500 = maintenance operations (DOE).
Yes, that is our standard case. But we can also model from a cloud provided by a third party (upstream cloud quality audit, georeferencing to verify).
Yes. Our models pass an IFC audit (Solibri) before delivery. Classification, geolocation, systematic properties. The client's BIM Manager validates the delivery before closing.
Scan: 2 days. LOD 200 modeling: 8 working days. IFC audit: 1 day. Total: ~15 calendar days. For LOD 300, add 8 to 12 days.
Priced quote within 48 h. Mobilization within 5 working days. Contractual delivery in 15 days.