Lavéra and ICPE complexes
Refinery, oil terminals, upper-tier SEVESO sites. Scanner survey under HSE protocol, IFC delivery for maintenance BIM.
PACA studio, working in Martigues, the Lavéra petrochemical complex, the Port of Caronte and the western Étang de Berre.

Martigues, the "Provençal Venice", combines three logics: an old island center with a Mediterranean feel (Quartier de l'Île, Jonquières, Ferrières), a major petrochemical hub (Lavéra refinery, ESSO Fos-Lavera, terminals), and the Port of Caronte. Three very distinct mission types.
For industrial work (Lavéra), we operate under strict HSE protocols (N1/N2 ICPE training available). For Île heritage, our surveys are ABF-compatible. For the Port of Caronte, RTK drone + scanner for quay and facility mapping.
Revit, IFC 4.0, DWG plans and orthophotos delivered in 15 days. Lambert-93 georeferencing.
From ICPE industrial work to Quartier de l'Île heritage.
Three typologies recurring on the western Étang.
Refinery, oil terminals, upper-tier SEVESO sites. Scanner survey under HSE protocol, IFC delivery for maintenance BIM.
Fishermen's houses, Saint-Sébastien aqueduct bridge, Annonciade chapel. ABF surveys.
Quays, hangars, shipyard facilities. Drone + scanner combined.
Martigues intra-muros and the entire western Étang de Berre.
Towns served: Port-de-Bouc, Fos-sur-Mer, Saint-Mitre-les-Remparts, Châteauneuf-les-Martigues, Sausset-les-Pins, Carry-le-Rouet.
Adapted HSE protocol, N1 ICPE training available. Compatible with industrial maintenance BIM.
Heritage surveys of Quartier de l'Île match ABF expectations.
SIA / Marignane coordination handled. AlphaTango declaration included.
Delivery compatible with refining BIM Managers (IFC 4.0, industrial classification).
With the client's authorization and HSE coordination, yes. Our operators hold N1 ICPE training and wear upper-tier SEVESO-grade PPE. We work in campaigns (zone-by-zone acquisition, off-site registration, phased delivery).
Overflying ICPE facilities is subject to prefectoral + DGAC + operator authorization. ARPEO puts together the file, lead time 15 to 30 days depending on the zone. Better paired with a terrestrial scan for fine detail.
Priced quote within 48 h, mobilization within 5 working days. Revit, IFC or DWG delivery in 15 days.