Anjoly and Couperigne
XXL warehouses, cross-dock platforms. Geometric survey for extensions, indoor scan for reorganization, monthly drone monitoring.
PACA studio, working in Vitrolles, the Étang de Berre area, and the Anjoly / Couperigne logistics parks.

Vitrolles is the metropolitan logistics gateway: Marseille-Provence airport, Aix TGV station, A7 motorway, multimodal platform. The economic fabric blends logistics (Anjoly, Couperigne), airport industry, and residential (Vieux Vitrolles, Le Rocher, Liourat).
For Vitrolles missions, ARPEO deploys the laser scanner and RTK drone. Mandatory coordination with the Marseille-Provence airport CTR zone: SIA declaration included in the package.
Revit, IFC, DWG delivery in 15 days. Lambert-93 georeferencing for interfacing with metropolitan GIS.
Adapted to the constraints of airport logistics areas.
Three typologies recurring around the Étang.
XXL warehouses, cross-dock platforms. Geometric survey for extensions, indoor scan for reorganization, monthly drone monitoring.
Maintenance hangars, rental sites, long-stay car parks. Drone allowed with SIA coordination.
Energy audit, BIM operations, refurbishment.
Vitrolles intra-muros and the entire eastern shore of the Étang de Berre.
Towns served: Marignane, Rognac, Velaux, Berre-l'Étang, Les Pennes-Mirabeau, Cabriès, Bouc-Bel-Air.
SIA declaration managed for every drone mission around the airport. No risk of late cancellation.
Off-hour work possible (24/7 warehouses). OPC coordination.
Delivery in metropolitan GIS format. Lambert-93 georeferencing.
Vitrolles is 30 km from the ARPEO base. Mobilization within 3 to 5 working days.
With SIA declaration + AlphaTango authorization. Vitrolles is partially in CTR. Every drone mission requires a prior declaration, handled by ARPEO within the package. Lead time 7 to 15 days.
Yes. Off-hour work possible (night, weekend) or semi-operational (signposted buffer zone). OPC/SPS coordination from the client is essential.
Priced quote within 48 h, mobilization within 5 working days. Revit, IFC or DWG delivery in 15 days.