SERVICE · 06 / 06

Construction monitoring
by drone.

Monthly or bimonthly flight. 2 cm/pixel orthophoto, progress comparison, cubature calculation, dashboard shared between MOA, MOE, OPC.

Drone view of a construction site, monthly photogrammetry for progress monitoring.
Frequency
1 / month
or bimonthly per site
Resolution
2 cm/pixel
standard construction GSD
Delivery
7 days
after monthly flight

Drone construction monitoring is a strongly expanding practice in French construction — ENGIE, Bouygues, Vinci and Eiffage have made it standard on their major sites since 2020. The principle: a monthly or bimonthly drone flight produces a high-resolution orthophoto + a 3D mesh of the site. Successive periods are compared to measure progress, calculate cubatures, control compliance, and arbitrate planning gaps.

ARPEO offers construction monitoring under monthly subscription or phase-based package (earthworks, structural work, finishes). DJI Matrice 4E + RTK flight. Contractual delivery 7 days after each flight: 2 cm/pixel orthophoto, DSM (Digital Surface Model), comparison with previous period, shared dashboard.

The dashboard is accessible online to project stakeholders (MOA, MOE, OPC, contractors): free navigation through periods, length / surface / volume measurements directly in the browser, collaborative annotation. Compatible with BIM Track, BIMcollab, Aconex platforms.

Initial mobilization within 5 working days. Recurring flights scheduled at the start of the month. Contractual delivery 7 days after each flight. Typical monthly package: €600 to €1,800 excl. VAT depending on site surface (from 1 ha up to 50 ha).

— EQUIPMENT

Equipment & dashboard

Drone, temporal photogrammetry and comparison platform.

Main drone

DJI Matrice 4E + RTK

  • Recurring flight in automatic plan
  • ±2 cm RTK accuracy
  • See Drone page for full specifications
Temporal photogrammetry

Reality Capture

  • Processing of each monthly flight
  • Orthophoto + DSM generation
  • Inter-period cubature calculation
Comparison platform

ARPEO Dashboard

  • Web visualization of orthophotos by period
  • Side-by-side or overlay comparison
  • Length / surface / volume measurements
  • Collaborative BCF annotation
  • BIM Track, BIMcollab, Aconex compatible
Ground Control Points on site

Permanent GCP targets

  • Fixed targets for the duration of the site
  • RTK GNSS-pointed once
  • Guarantee inter-period accuracy
— PROCESS

How construction monitoring unfolds

Five steps for reliable recurring monitoring.

  1. 01 · BRIEF

    Package and frequency

    Briefing: site surface, frequency (monthly / bimonthly / quarterly), commitment duration, shared dashboard.

    Duration1 week
  2. 02 · SETUP

    GCP placement + flight 0

    Permanent GCP targets placed on site, RTK-pointed. Flight 0 (initial state). First orthophoto + DSM deliverable.

    Duration1 day
  3. 03 · RECURRING FLIGHTS

    Automated monthly flight

    Flight per pre-set plan (80%/60% overlap). 30 min per flight for 5 to 10 hectares. Automatic photo.

    Duration30 min / month
  4. 04 · PROCESSING

    Photogrammetry + comparison

    Reality Capture. Orthophoto, DSM, mesh. Automatic comparison with previous period (cubatures, gaps, progress).

    Duration5 to 7 days
  5. 05 · DASHBOARD

    Dashboard update

    Posting to the ARPEO dashboard. Notification to project stakeholders. Collaborative measurements and annotations.

    Duration1 day
— USES

Uses by sector

Six sectors where drone construction monitoring has become a standard.

RESIDENTIAL BTP

Subdivisions and residences

Monthly progress monitoring, earthworks control, planning compliance verification. For developer MOA and MOE.

TERTIARY BTP

Offices and logistics platforms

Monitoring of large sites (5 to 50 ha). Backfill cubatures, permit compliance, legal archiving.

CIVIL ENGINEERING

Bridges, roads, civil structures

Temporal monitoring of linear structures. Geometric control vs execution plan. IQOA compliance.

EARTHWORKS

Quarries and cubature works

Precise cubature calculation (±2 cm). For per-cube billing, quarry operation monitoring, stock management.

URBAN PLANNING

Brownfields under rehabilitation

Monitoring of urban redevelopment sites (Euroméditerranée, ZAC). Temporal documentation for MOA communication.

INFRASTRUCTURE

Networks and linear works

Monitoring of network construction (water, gas, electricity, fiber). Execution documentation and structure geolocation.

— DELIVERABLES

Delivery formats

Recurring deliverables accessible via the dashboard.

FormatUsageSize
Orthophoto TIFF
Rasterized image 2 cm/pixel per period
Rasterized image 2 cm/pixel per period200 MB to 2 GB / flight
DSM / DTM TIFF
Altimetric model for cubature calculation
Altimetric model for cubature calculation50 to 500 MB / flight
Monthly PDF report
Progress summary, cubatures, gaps vs plan
Progress summary, cubatures, gaps vs plan20 to 100 MB / flight
Turn-around video
HD site video for MOA communication
HD site video for MOA communication200 MB to 1 GB / flight
Before / after comparison
Side-by-side animation of monthly evolution
Side-by-side animation of monthly evolutionAccessible via dashboard
Shared web dashboard
Free navigation, measurements, BCF annotations
Free navigation, measurements, BCF annotationsSSO web access
— STANDARDS

Framework & best practices

Reference recognized by the major players in French BTP.

ENGIE Construction Drone Manual

Drone monitoring reference adopted by BTP majors.

BIM Track / BIMcollab integration

BCF annotations synchronized with existing BIM tools.

Data protection charter

Site photos treated as confidential data, restricted access.

DGAC specific category

Site flights (potentially populated zone) under S2 or S3 scenario.

— PRICING

How much does construction monitoring cost

Monthly package by surface and frequency. Annual commitment possible.

Package
from €600 excl. VAT / month
View the full pricing grid
— FAQ

Construction monitoring — frequently asked questions.

  • What flight frequency for a construction site?

    The standard is a monthly flight — enough to track progress and document the site. On critical phases (earthworks, foundations, structural work), a bimonthly flight may be relevant. On long phases (finishes, fit-out), a quarterly flight is enough.

  • What accuracy for cubatures?

    ±2 cm with RTK drone + ground GCP targets. On a 10,000 m³ earthworks, absolute accuracy of ±200 m³ i.e. 2 % error. Compatible with per-cube billing and MOE control.

  • Who can access the shared dashboard?

    All project stakeholders designated by the MOA: MOA, MOE, OPC, contractors, engineering offices. Individual accounts with differentiated rights (read-only, annotation, export). SSO compatible on request.

  • Can drone monitoring be integrated into a BIM tool?

    Yes. Compatible with BIM Track, BIMcollab, Aconex via BCF export. The 3D site mesh can be overlaid on the 4D BIM model in Navisworks or Synchro Pro for project / actual comparison.

  • How much does monitoring cost over a year?

    Indicative: 1 to 3 hectare site, monthly flight = €600/month excl. VAT = €7,200/year. 10 to 30 hectare site = €1,200/month = €14,400/year. Annual commitment with typical 10 % discount.

  • What happens if the site is delayed?

    The monthly package is still due even if the site is delayed — the value of monitoring is in the temporal documentation, not the physical progress. Frequency reduction possible (bimonthly or quarterly) mid-site via amendment.

Start a construction monitoring project? Quote in 48 h.

Mobilization within 5 working days. Contractual delivery in 15 days.